Over the years, we have worked with the goal of providing lifting and load-handling solutions that meet the highest standards of quality and safety. Today, we are pleased to announce the inauguration of the Basajaun Testing Site, a space dedicated to validating and testing large-scale lifting solutions for the offshore wind industry, reinforcing our position as a key player in the offshore sector.

What is this new facility, and what benefits will it bring to both our company and the industry as a whole?
The Basajaun Testing Site is located at the Port of Pasaia and is the result of a €3 million investment. This testing bench, with a load capacity of 5,100 tons and a surface area of 2,000 m², is designed to evaluate lifting solutions used in the installation of the largest and heaviest components of offshore wind farms.
With this infrastructure, we can conduct static and dynamic tests that simulate real-life conditions in which these systems operate at sea, advancing the development of safer and more efficient solutions for the renewable energy industry.
The Basajaun Testing Site represents our commitment to a more sustainable energy future and is a reflection of our ability to adapt to the increasingly demanding and competitive offshore
sector.
Alongside the inauguration of the Basajaun Testing Site, we are developing KIMUA Port, our new 1,500 m² production plant. This facility will allow us to manufacture lifting solutions specifically for the offshore industry, supporting not only wind energy but also related sectors such as wave energy and Oil & Gas.
The launch of the Basajaun Testing Site is not only a step forward for KIMUA but also for the offshore industry as a whole. By providing an advanced testing facility for the largest wind energy components, we help strengthen the global supply chain and improve manufacturing and transportation processes for these systems.
At KIMUA, we continue to implement methodologies that ensure quality at every stage of a project, from design to final delivery. Additionally, the creation of this testing bench is a clear demonstration of our commitment to energy transition and planetary sustainability, ensuring that our solutions contribute to a cleaner future.
With the inauguration of the Basajaun Testing Site, we continue to build a strong and secure future for the offshore wind industry. At KIMUA, we will keep innovating and offering tailor-made solutions that support the development of sustainable and high-performance projects in the offshore sector.
Basajaun is our 5,100-ton proof-load testing laboratory, specializing in certifying heavy-lift equipment for offshore energy, infrastructure, and industrial projects. Each test is carefully planned with maximum safety, real-time monitoring, and post-test measurement, ensuring reliable results and worker protection.
Wind turbine maintenance leaves no room for error. With our handling and lifting solutions, every intervention becomes a safe, fast and reliable process. Fewer risks, less downtime and more productivity for your wind turbine.
Kimua launches Kimua Port, its new production plant at the Port of Pasaia. A strategic space that, together with Basajaun, enables the design, manufacture, and testing of high-capacity lifting equipment with efficiency, sustainability, and proximity to the offshore industry