KIMUA Group has recently finished the process of engineering & manufacturing a certified offshore frame prototype that will transport theADWEN’s 8 MW tower sections in an upright position on a vessel.
KIMUA Group’s team of engineers powered this project since its early stages and drove it through the process until achieving the Product Certification from DNV-GL, the scope of the certificate covers the main stages of the project: engineering & manufacturing.
In order to provide a complete set of services for its Client, a Fit Test was performed at KIMUA Group’s facilities prior to delivery; additionally, aTutorial Video was supplied to ADWEN; in this sense, the video included not only detailed instructions for handling the frame, but also the safety protocols to follow when maneuvering the tool.
Kimua has been present at major events in April, connecting with key players and reaffirming its commitment to innovation in wind energy and advanced industrial solutions.
Kimua will be present at FOWT in Prest, IBF in Marseille, and IPF in the USA, showcasing our advanced services and solutions for handling large components. Don’t miss it!
Kimua will be present at WindEurope 2025 in Copenhagen, showcasing solutions like Heldu and Tartalo. In addition, they will offer services through Kimua Air, Kimua Port, and Basajaun, providing a comprehensive package: design, manufacturing, testing, and commissioning. Don’t miss it!