KIMUA takes part in the first Offshore Wind Farm of United States by engineering and manufacturing a Tower Assembly and Storage Frame; KIMUA’s tool is currently being used in the erection of GE’s wind turbines at its Tower Assembly Facility in Providence Port (Rhode Island).
Wacth the following video published by GE:
Source: General Electric. Block Island Wind Farm Tower Assembly Event at ProvPort from Deepwater Wind on Vimeo.
Basajaun is our 5,100-ton proof-load testing laboratory, specializing in certifying heavy-lift equipment for offshore energy, infrastructure, and industrial projects. Each test is carefully planned with maximum safety, real-time monitoring, and post-test measurement, ensuring reliable results and worker protection.
Wind turbine maintenance leaves no room for error. With our handling and lifting solutions, every intervention becomes a safe, fast and reliable process. Fewer risks, less downtime and more productivity for your wind turbine.
Kimua launches Kimua Port, its new production plant at the Port of Pasaia. A strategic space that, together with Basajaun, enables the design, manufacture, and testing of high-capacity lifting equipment with efficiency, sustainability, and proximity to the offshore industry